Site survey

We are pleased to arrange a visit to your site within a specific geographic area. Please note that this service incurs a fee based on the distance from our location. This fee will be deducted from your project cost upon placing your order.
Getting the site ready
Our building manufacturer, Northedge Steel, lists what a site needs before the crew arrives:
- At least 3 feet of level, clear ground around the whole footprint, free of plants, structures and debris.
- Stakes or marks at all four corners, with equal diagonal measurements so the building can be squared.
- Ground within about 3 inches of level along the whole perimeter. A string line and a string level between the stakes is an easy check.
- Overhead power lines within 10 feet of the building's peak height disclosed before scheduling.
- A call to 811 to have public utility lines marked free of charge. Private lines are marked by the property owner.
- Room for the crew's truck and trailer, about 55 to 60 feet long, to reach the site, unload and turn around. Sharp curves, steep hills or tight spaces can prevent installation.
Why it matters
An unlevel site can leave gaps under doors and at corners, add labor charges, or stop an installation. If the crew cannot install because the site is not ready, a restocking fee of $200 or 5% of the building price, whichever is greater, applies.
Source: Northedge Steel dealer handbook, Northedge Steel: Our Process
